BHP engaged GRS to complete the Headframe Erection at Prominent Hill in South Australia. GRS completed stage 1 planning and stage 2 for the erection of the headframe.
-
RCR engaged GRS to carry out the installation of a new furnace.
-
BHPB engaged GRS to prepare a methodology and completed the planning and scheduling of their plant shutdown.
-
GRS was engaged on planning, scheduling and project management using the local Maintenance contractor direct for labour supply.
-
GRS was invited to submit a proposal inclusive of fabrication of new pots, planning and scheduling and installation.
-
GRS was invited by recommendation to give a proposal for the duration of the shutdown to replace CV003 and modify the existing Hopper 5 tower including the Hopper itself.